Construction

What We Do

The Street Maintenance Division mills and paves streets that are in need of a complete resurfacing. Other streets that have good structure will have a layer asphalt applied to them called an overlay. Construction months are May through October.

What Should Residents Do?

  • Please drive carefully around construction sites and follow traffic control signs and flaggers.

Did You Know?

  • Once the asphalt is applied to the street, surface temperatures can reach from 180 to 200 degrees.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5